SOPWarehouseSOP Generator

Packing Station Operations

Order packing at a fixed pack station, covering carton selection and void fill, contents and weight verification before sealing, shipping label placement, safe use of box cutters and tape guns, and station housekeeping that keeps the pack floor free of slip and trip hazards.

Audience
Packing associates
Review cycle
annual
Last reviewed
2026-08-14
Revision
1

What is in the procedure

7 sections. Regulatory language is fixed and passes through verbatim. Sections marked customized get rewritten around your facility, your equipment, and your job titles.

  1. 01

    Purpose

    Fixed

    This procedure establishes how a picked order is verified, packed, sealed, and labeled at a pack station.

  2. 02

    Scope

    Customized

    This procedure applies to manual packing at a fixed pack station, covering single and multi carton orders.

  3. 03

    Responsibilities

    Customized

    Packers verify contents against the order, select the correct carton, verify weight before release, apply the label to a clean flat surface, and keep the station and the floor around it clear.

  4. 04

    Procedure: Verification, Carton Selection, and Packing

    Customized

    Verify before you pack, because an error caught at the station costs a minute and an error caught by the customer costs the order.

  5. 05

    Procedure: Blade Safety and Station Housekeeping

    Fixed

    Cutting tools and accumulated packaging waste cause most pack area injuries, so both are controlled continuously and not at the end of the shift.

  6. 06

    Exception Handling

    Customized

    Stop and resolve rather than packing around a problem whenever any of the following occurs: an item scan rejects or does not match the order, the tote is short or contains an item not on the order, an item is damaged...

  7. 07

    References

    Fixed

    29 CFR 1910.22 Walking-working surfaces, general requirements.

OSHA references

Packing Station Operations: 29 CFR 1910.22(a)

Every SOP generated from this template cites the paragraphs below, with a plain-language summary of what each one requires. Citations are informational and are not legal advice.

StandardTitleWhat it requires
29 CFR 1910.22(a)Walking-working surfaces: general requirementsWalking-working surfaces must be kept in a clean, orderly, and sanitary condition, free of hazards such as sharp or protruding objects, loose boards, spills, and debris that create slip, trip, or fall hazards.
29 CFR 1910.176(a)Materials handling: use of mechanical equipmentWhere mechanical handling equipment is used, sufficient safe clearances must be allowed for aisles, at loading docks, through doorways, and wherever turns or passage must be made. Aisles and passageways must be kept clear and in good repair, with no obstruction across or in aisles that could create a hazard, and permanent aisles must be appropriately marked.

Compliance checklist

What an inspector looks for

  • The pack station floor and surrounding walkway are kept clean, dry, and free of corrugate, banding, void fill, and spills

    29 CFR 1910.22(a)

  • Totes, carton stock, and pallets never extend into the aisle or block an exit, electrical panel, or fire extinguisher

    29 CFR 1910.176(a)

  • Only facility issued self retracting or fully guarded safety cutters are used, and used blades go into a puncture resistant sharps container

  • Every item is scanned and counted against the order and the carton weight is verified before the carton is sealed and released

  • Shipping labels are applied flat on a single surface with no wrap around a seam, no tape over the barcode, and old labels removed or covered

Waitlist

Generate this SOP for your facility

At launch you answer the facility questionnaire once and this template comes back with your equipment, your titles, and your sign-off sheet attached.

First access at launch, plus launch pricing locked for a year.

This page is informational and is not legal advice. Have a qualified safety professional review any procedure before it goes into service at your facility.